Widening From End To End And Strengthening At Km 0/0 - 0/435 Of Sannathi Ramalinganar Street And Extra Length Of 410m Durabali Street Total 845m And Reconstruction Of Culvert, Construction Of Drain And Providing Paver Block Tn No 31 2024 25 Hdo Dt 11 03 2025 Sannathi 0.0